The £1.1million project for the Liverpool Convention Centre to supply 340 panels, constructing a total of 34 separate walls ranging from 3 to 20 panels per wall were fitted across a total area of 2,400 sqm.
A combination of 8m, 6m, and 4.5m panels with an acoustic rating of Rw55dB ensured that the main conference area had the flexibility to be arranged from either one, two, four or six rooms each enjoying full acoustic comfort in each room.
The project took 12 months to complete, working in conjunction with Wilkinson Eyre as the architects and Sandy Brown the acousticians, in the development of the PremierWalls used.
The main contractors were Bovis Lend Lease.